Proof of Concept
November 10, 2026About 2 min
Proof of Concept
This document is primarily intended to describe how to provide Proof of Concept (PoC) for HyperMotion & HyperBDR before the project.
PoC Scope Overview
| Solution Component | In Scope |
|---|---|
| Investigation | - Gathering and Assessment about detail technical specification requirements |
| - Information gathering & analysis | |
| Schedule | - Provide PoC schedule |
| Deployment | - Provisioning Cloud (VM) |
| - Setup HyperMotion & HyperBDR Server (for x VM/Server) | |
| - Setup HyperMotion & HyperBDR Agent/Agentless (for x VM/Server) | |
| - Setup and Configuration Migration/DR Backup (Source VM/Server to Cloud) | |
| Functional Testing | - Data Sync - Data Sync Policy - Drill Testing - (Optional) Failback Testing (for x VM/Server) |
HyperBDR UAT
DR Scope
| Solution Component | In Scope |
|---|---|
| Configuration | - Configuration HyperMotion & HyperBDR |
| - Configuration OBS or Block storage backup mode on Cloud | |
| - Configure Cloud as the Migration/DR Recovery Site | |
| Post Deployment | Drill & Takeover: |
| - Testing Data Sync Process (Policy, Incremental) | |
| - Testing Drill & Takeover (to VM in Cloud) | |
| Finalization | - Hand over after deployment is ready in the production |
(Optional)Failback Scope
| Solution Component | In Scope |
|---|---|
| Configuration | - Configuration HyperBDR System |
| - Configuration OBS or Block storage failback mode on Cloud | |
| - Configure Production Site | |
| Post Deployment | Failback: |
| - Testing Failback Process (Full Data Transmission) | |
| - Testing Failback Recovery (to VM in source production Site) | |
| Finalization | - Hand over after deployment is ready in the production |
Out of Scope
| Solution Component | Out of Scope |
|---|---|
| Network Configuration | Configuration existing Backup Network and Firewall such as: |
| • Configuration and construction of the cloud special line and the Access test (VPN and source production firewall) | |
| • Configuration DR Network and Drill & Takeover Network on Cloud | |
| Business Validation | Verify Drill & Takeover business service availability |
| Verify Failback business service availability |
Warning
Due to the critical importance of networking for cloud disaster recovery, we also aim to assist users as much as possible in completing network configurations.
Responsibility Matrix
Network
Warning
This section is only applicable when users need to use an intranet for output transmission. If users are using a public network solution, they can skip this part.
| No | Item | OnePro | Customer |
|---|---|---|---|
| 1 | Cloud VPN settings(VPN Service or Open Source Solution) | Assist | ✓ |
| 2 | Private credentails for VPN | Assist | ✓ |
| 3 | Firewall Settings | ✓ | |
| 4 | Connectivity Testing | ✓ |
Drill & Takeover
| No | Item | OnePro | Customer |
|---|---|---|---|
| 1 | On-Premises backup server / VM | ✓ | |
| 2 | Accessing Remote | ✓ | |
| 3 | Cloud Provisioning | ✓ | |
| 4 | Setup HyperMotion & HyperBDR | ✓ | |
| 5 | Hosts Register in Console | ✓ | |
| 6 | Data Sync & Policy Settings | ✓ | |
| 7 | Drill & Takeover | ✓ | |
| 8 | Make sure host boot to login status | ✓ | |
| 9 | Business System Validation | ✓ |
Failback
| No | Item | OnePro | Customer |
|---|---|---|---|
| 1 | Accessing Remote | ✓ | |
| 2 | Install Agent on failback VMs on Cloud | ✓ | |
| 3 | Setup HyperBDR Console | ✓ | |
| 4 | Failback Host Register in HyperBDR Console | ✓ | |
| 5 | On-Premises failback server / VM Preparations | ✓ | |
| 6 | Failback Full Data Sync | ✓ | |
| 7 | Restore failback server / VM | ✓ | |
| 8 | Business System Validation | ✓ |
PoC Success Criteria
Click here to access the complete spreadsheet. Please download and print the spreadsheet for easy confirmation of the PoC results after completion.
PoC Success Criteria Checklist
| No | Criteria | Pass | Fail | Remarks |
|---|---|---|---|---|
| Success Parameter – DR Backup (for x VM/Server) | ||||
| 1 | Backup process On-prems to Cloud | |||
| 2 | Configuration DR & Backup Policy | |||
| 3 | Full and Incremental Backup | |||
| 4 | Drill Backup (to VM in Cloud) | |||
| 5 | Validity Drill business service availability in Cloud | |||
| (Optional) Success Parameter – Failback (for x VM/Server) | ||||
| 1 | Failback process Cloud to On-prems | |||
| 2 | Full data transmission | |||
| 3 | Restore failback server / VM in On-prems | |||
| 4 | Validity after failback business service availability |
| Prepared by, | Accepted by, |
|---|---|
| e.g. MSP Company | e.g. Cusotmer Company |